Blackburn Foundation Repair Case Studies

Case Study: PolyLevel
Project: Rapid City Waste Water Facility

Location: Rapid City, SD
Date: October 2016
Blackburn Foundation Repair went in and lifted the concrete slab poured to support the city’s 27,000 pound generator for the waste water facility plant. The entire PolyLevel installation process went extremely well, and the project was completed ahead of schedule in only one day’s time.